Twin Villas

CompletedTürkiye
Explore the project
Floors
2
Bedrooms
4
Units
2
Duration
6 months
Start
December 2023

You have been dreaming of the perfect home, surrounded by nature — and now that dream is coming true. Started on 16 December 2023, this remarkable project invites you into a dream that comes to life before your eyes. These villas are more than a housing project; they are a fresh start for you and the people you love.

Details

Our twin villas each offer a 4+1 layout with high ceilings and airy spaces. They are designed so that neither overlooks the other, giving each family its own private world. The ground floor holds a modern kitchen, a spacious living room, a bedroom and a bathroom with WC. Upstairs are a laundry room and three bedrooms, with the master bedroom finished with a walk-in wardrobe, en-suite WC and a private hammam.

The villas are equipped for the demands of modern life: VRF climate systems, parking, a lift-up fireplace, automatic shutters and insect screens are all details designed for your comfort. Built with first-class materials and workmanship, they also offer underfloor heating, full external insulation and state-of-the-art thermal and acoustic insulation.

Each villa has its own 30 m² pool and generous landscaped garden. Inohome smart-home systems allow remote control of the boiler, air conditioning, lighting, curtains and shutters, while a 24/7 security camera system and emergency mobile notifications keep the household safe.

In these villas you will have every comfort of modern life. Built with quality materials and attention to every detail, they are a place to enjoy peace and comfort — and EN-AR Yapı İnşaat is here to bring the home of your dreams to you.

Twin Villas
Twin Villas — Türkiye
HIGHLIGHTS

Care in every detail.

  1. 4+1 villas with high ceilings

  2. Private 30 m² pool

  3. Private layout — neither villa overlooks the other

  4. Hammam and walk-in wardrobe in the master bedroom

  5. Inohome smart-home system

  6. VRF climate control and underfloor heating

  7. Lift-up fireplace

TIMELINE

The journey of the project.

  1. StartDecember 2023
  2. ConstructionCompleted
  3. Handover6 months
GALLERY

A closer look in 21 images.

LOCATION

Türkiye

Open in maps

Interested in this project?

Our team is happy to share the details, plans and process of the project with you.